The foundation holes need to be filled with poured concrete, which can be done manually. They are then capped with paving slabs – when building they are set at a slight angle avoid sitting water.
- Drop the Poured concrete foundation pile component into all the holes, aligning the top face with the bottom end of the level lines at the ground level. This will take a lot more effort when building the house!
- Select and show the 3D paving slabs layer
- Drop the paving slab component onto each foundation pile to cap it, aligning with the same level.
- You just built the foundations for your house!