To complete the groundworks, you need to fill in a line of paving slabs around the perimeter of the house’s footprint, and fill the area within this with a layer of gravel.
Slabs:
- Make sure the Layer0 (grid), 3D site terrain and 3D paving slabs layers are visible, and the 3D paving slabs layer selected.
- Drop paving slab components onto the grid at each centreline grid intersection around the house perimeter between the post locations.
- Move each slab vertically down to the ground level, aligning the appropriate corner of its top surface with the highest point at which the slab meets the ground.