- Repeat the raising process for the other frames in turn
- When building, a small piece of roofing lead is sandwiched under the end of the post timber as it is raised – this is compressed by the weight of the structure and seals the end of the timber against moisture.
- As you go, brace the frames together with crossed bracing timbers at 45° at each post
- With the frames raised and braced, you can start to see the house taking shape
- When building, you will need to carefully check the frame spacing and adjust as necessary